Building application in Zurich
Local submission route and documents
Source checked: 24.10.2026
Reply within 2 working days · anfrage@baubewilligt.ch
What is permit-free in the canton of Zurich, what needs a notification and when a building application is mandatory, with the legal basis and our fixed-price service for towns and villages throughout the canton.
| Structure | Classification | Rule | Legal basis |
|---|---|---|---|
| Pergola | Depends on size and location | An open pergola up to 2.5 m high and 6 m² floor area is permit-free. Larger pergolas require a permit, usually in the simplified procedure or by notification. | § 1 lit. a BVV |
| Louvred roof | Building permit required | A louvred roof counts as a covered pergola or patio cover and requires a building permit. Depending on the municipality, notification or simplified procedure. | § 309 PBG, § 1 BVV |
| Patio cover | Building permit required | Patio covers expressly require a permit. | § 309 PBG |
| Carport | Building permit required | Carports and garages require a building permit. | § 309 PBG |
| Garden shed | Depends on size and location | Garden sheds up to 2.5 m high and 6 m² are permit-free (except in the historic core zone or protected areas). Above that: notification procedure for garden sheds and storage sheds. | § 1 lit. a, § 14 lit. m BVV |
| Pool | Building permit required | Permanently installed pools require a permit (changes to the terrain, technical equipment, drainage). | § 309 PBG |
| Heat pump (outdoor unit) | Depends on size and location | Air-to-water heat pumps can be installed under the notification procedure (Meldeverfahren) if the noise protection certificate is provided and the rules are met; otherwise a building application is needed. | § 1 BVV, LSV |
| Solar installation (special case) | Depends on size and location | Sufficiently adapted roof and facade systems: notification. In historic core zones, where townscape or heritage protection applies, free-standing or as a solar carport: building permit via eBaugesucheZH. | Art. 18a RPG, § 2a BVV |
Legal basis: Planning and Building Act (PBG) and Building Procedure Ordinance (BVV). Go to the cantonal information page.
Submission: eBaugesucheZH; the switchover date, signatures and any paper enclosures depend on the municipality.
Plan author: no formal professional qualification required for plan authors; plans must meet the requirements of the BVV and be signed by the client and the landowner.
Garden sheds and storage sheds follow the notification procedure (§ 14 BVV); smaller projects follow the simplified procedure without profile poles or publication. The municipality decides on the procedure.
Buildings and installations up to 2.5 m total height and 6 m² floor area are permit-free in building zones, but not in core zones, protected areas or where protection orders apply (§ 1 let. a BVV).
eBaugesucheZH; the switchover date, signatures and any paper enclosures depend on the municipality. Garden sheds and storage sheds fall under the notification procedure (§ 14 BVV), smaller projects under the simplified procedure without staking out or publication. The municipality decides on the procedure.
No formal professional qualification is required for plan authors; plans must meet the requirements of the BVV and be signed by the building owner and the landowner.
Building application costs and scope of services · Prepare it yourself or have it done? · Dossier lead time and authorities' procedure
Digital submission, paper enclosures and signatures differ from place to place. These local pages contain notes with an official source.
Local submission route and documents
Source checked: 24.10.2026
Fully digital via eBaugesucheZH
Source checked: 24.10.2026
Switch to digital on 1 February 2027
Source checked: 24.10.2026
We use these cantonal administration pages for every application. Checked on 24.10.2026.
All sources by municipality: list of sources.
Every municipality has its own building and zoning regulations. We check them for your location, even if your village has no local page here.
Assessment in 2 working days. Non-binding.