Affoltern am AlbisMunicipality in the Canton of Zurich

Building permit in Affoltern am Albisfor pergolas, louvred roofs, carports, garden sheds and pools

Small structures in Affoltern am Albis are governed by the building law of the canton of Zurich plus the municipality's building and zoning regulations. We prepare the complete application, submit it to the competent building authority and support you through to the decision: fixed price from CHF 690.

A digital service by SL Handel GmbH, based in Zug, for your project in Affoltern am Albis.

Basic cantonal rule (Zurich): Buildings and installations up to 2.5 m total height and 6 m² floor area are permit-free in building zones, but not in core zones, protected areas or where protection orders apply (§ 1 let. a BVV).

Do I need a building permit?

Free initial assessment in 20 seconds: 9 cantons, 8 structures, as of October 2026.

What needs a permit in Affoltern am Albis

StructureClassification (canton of Zurich)Rule
Pergola Depends on size and location An open pergola up to 2.5 m high and 6 m² floor area is permit-free. Larger pergolas require a permit, usually in the simplified procedure or by notification.
Louvred roof Building permit required A louvred roof counts as a covered pergola or patio cover and requires a building permit. Depending on the municipality, notification or simplified procedure.
Patio cover Building permit required Patio covers expressly require a permit.
Carport Building permit required Carports and garages require a building permit.
Garden shed Depends on size and location Garden sheds up to 2.5 m high and 6 m² are permit-free (except in the historic core zone or protected areas). Above that: notification procedure for garden sheds and storage sheds.
Pool Building permit required Permanently installed pools require a permit (changes to the terrain, technical equipment, drainage).
Heat pump (outdoor unit) Depends on size and location Air-to-water heat pumps can be installed under the notification procedure (Meldeverfahren) if the noise protection certificate is provided and the rules are met; otherwise a building application is needed.
Solar installation (special case) Depends on size and location Sufficiently adapted roof and facade systems: notification. In historic core zones, where townscape or heritage protection applies, free-standing or as a solar carport: building permit via eBaugesucheZH.

This table shows the cantonal rules. The municipality of Affoltern am Albis may set additional requirements in core zones, protected townscape areas and through its building regulations. We check the zoning plan and regulations for your plot. Cantonal information source.

Affoltern am Albis at a glance

Competent office
Affoltern am Albis Construction and Infrastructure (Bau und Infrastruktur)
Submission
eBaugesucheZH; changeover date, signatures and any paper enclosures depend on the municipality.
Building and zoning regulations
Affoltern am Albis regulations and zoning plan
Municipal fees
According to the municipal fee schedule, paid directly to the municipality.
Cadastral plan
From the geoportal of the canton of Zurich; we obtain the extract.
Plan author
No formal professional qualification is required for plan authors; plans must meet the requirements of the BVV and be signed by the building owner and the landowner.

Official sources checked on 24 October 2026. The municipality's information is authoritative.

How much does a building application cost in Affoltern am Albis?

Preliminary check: is a permit needed?CHF 149credited
Complete application for a pergola, louvred roof, carport, garden shed, pool or heat pumpCHF 690fixed price
Solar special case (core zone or protected building)CHF 1'290fixed price
Fee of the municipality of Affoltern am Albisas per tariffyou pay the municipality

Example: a 20 m² louvred roof on your house in Affoltern am Albis. You pay us CHF 690 for the application file, submission and queries. The municipality invoices its permit fee separately. We tell you the expected amount in the preliminary check.

Request a fixed price for Affoltern am Albis

Documents for your building application in Affoltern am Albis

You provide little, we handle the rest. Here is how it is split:

To the building application checklist with official submission examples

What you send us

  • Address of the property in Affoltern am Albis
  • 3 to 5 photos of the site (façade, patio, towards the boundary)
  • Dimensions or the manufacturer's drawing of the product
  • Signature of the building owner and the landowners
  • For condominium ownership: consent of the owners' association

What we obtain and prepare

  • Cadastral plan from the official survey
  • Site plan with the structure, dimensions and boundary distances
  • Application form for the canton of Zurich, fully completed
  • Construction description, elevations and list of enclosures
  • Check of the Affoltern am Albis zoning plan and regulations
  • Depending on the structure: noise certificate (heat pump), neighbours' consent

Frequently asked questions about building applications in Affoltern am Albis

Where do I submit a building application in Affoltern am Albis?

At the building authority of the municipality of Affoltern am Albis. eBaugesucheZH; the switchover date, signatures and any paper enclosures depend on the municipality.

Do I need a permit for a louvred roof in Affoltern am Albis?

A louvred roof counts as a covered pergola or patio cover and requires a building permit. Depending on the municipality, notice procedure or simplified procedure. Legal basis: § 309 PBG, § 1 BVV.

Is a garden shed permit-free in Affoltern am Albis?

Garden sheds up to 2.5 m high and 6 m² are permit-free (except in core zones or protected areas). Above that: notice procedure for garden sheds and storage sheds. Legal basis: § 1 lit. a, § 14 lit. m BVV.

How much does a building application cost in Affoltern am Albis?

With us, the complete application costs a fixed price of CHF 690, including submission and queries; the preliminary check (CHF 149) is credited. The authority's fee comes on top and is based on the fee schedule of the municipality of Affoltern am Albis. We state the expected amount in the preliminary check.

Who may draw up the building application plans in Affoltern am Albis?

No formal professional qualification is required for plan authors; plans must meet the requirements of the BVV and be signed by the building owner and the landowner.

How long does a building application take in Affoltern am Albis?

We prepare the application file within 5 working days of receiving all required documents. The authority's processing time depends on the procedure, completeness and any objections.

Already built in Affoltern am Albis?

If the municipality of Affoltern am Albis requires a retrospective building application, the deadline is running. We confirm it on the same working day, check whether the project can be approved and submit within 3 working days. Retrospective building application

Documents, signatures, power of attorney

How to sign a building application in Affoltern am Albis

Who signs, whether a scan is sufficient and what simplifications apply. We apply this information automatically in your dossier.

Submission
eBaugesucheZH
Who signs
The building owner and the project author. If the property does not belong to the building owner alone, the consent of the other owners is required (§ 310 para. 3 PBG).
Form of signature
A scan or photo is sufficient
Electronic building application with a qualified electronic signature or with a hand-signed submission receipt (§ 6 para. 2 BVV). Power of attorney and third-party consents: signed by hand and scanned is sufficient; the original does not have to be submitted later (§ 6 para. 3 BVV).
Small projects
Solar installations, heat pumps and charging stations: notification procedure, notification at least 30 days before construction starts, no signature required (§ 2d BVV). Small projects in the notice procedure; written consent from neighbours is helpful there (§ 15 BVV).
Power of attorney
We submit as your authorised representative. We enclose the power of attorney with the application, so we need it with your handwritten signature.
Tenancy, condominium ownership
Tenants need the landlord's written consent (Art. 260a CO); as landowner, the landlord also signs the application. With condominium ownership, structural changes to common parts (façade, roof, patio with exclusive right of use) generally require the consent of all condominium owners or a resolution of the owners' meeting (Art. 647d, 647e and 712g CC). The condominium regulations are decisive.
Neighbours
Neighbours' consent is usually voluntary but often speeds up the procedure. If boundary or building distances are not respected, it is required, depending on the canton as an easement entered in the land register.
Good to know
Not all municipalities are connected to the portal yet; the transition period runs until 31 March 2027. Heat pumps: noise protection certificate according to Cercle Bruit and form for heating installations.

As of October 2026. Practice differs between municipalities; the municipality and canton are authoritative. Sources: Canton of Zurich: signature requirements, Canton of Zurich: notifying a solar installation.

More municipalities in the canton of Zurich

Your town isn't listed? We serve all municipalities in the canton of Zurich. Start an enquiry for your town.

Building application in Affoltern am Albis, from CHF 690.

Assessment in 2 working days. Non-binding.

Start enquiry
Start enquiryCheck