Canton of Zug11 local pages · all municipalities served

Building permit in the canton of Zugfor pergolas, louvred roofs, carports, garden sheds, pools and more

What is permit-free in the canton of Zug, what needs a notification and when a building application is mandatory, with the legal basis and our fixed-price service for towns and villages across the canton.

Permit-free in the canton of Zug: Permit-free projects include very small structures such as greenhouses and garden sheds up to 4 m² floor area and terrain changes up to 1.2 m high and 50 m³ (§ 45 V PBG). According to the cantonal government, an uncovered pergola requires neither a building application nor a building notification (RRB BD 2023-114).

Do I need a building permit?

Free initial assessment in 20 seconds: 9 cantons, 8 structures, as of October 2026.

Overview of all structures in the canton of Zug

StructureClassificationRuleLegal basis
Pergola Usually no permit required An uncovered pergola is not a small structure and, according to the cantonal government, needs neither a building application nor a building notice. With a roof, it becomes a building.RRB BD 2023-114, § 44a PBG
Louvred roof Building permit required With a fixed or movable roof, the structure counts as a small structure and needs a building application.§ 44 PBG
Patio cover Building permit required Patio covers are structures and require a building permit.§ 44 PBG
Carport Building permit required In Zug practice, carports are regularly treated as small structures and require a permit.§ 44 PBG, § 18 V PBG
Garden shed Depends on size and location Garden sheds up to 4 m² floor area are permit-free. Above that: building notice (Bauanzeige) for minor projects, or a building application.§ 45 V PBG, § 44a PBG
Pool Building permit required Permanently installed pools require a permit.§ 44 PBG
Heat pump (outdoor unit) Depends on size and location Outdoor units: building notice (Bauanzeige) if neighbours' interests are not significantly affected (noise certificate); otherwise a building application.§ 44a PBG
Solar installation (special case) Depends on size and location Solar installations with a construction notice; in protected zones, free-standing or as a solar carport, with a building application.§ 44a PBG, Art. 18a RPG

Procedure in the canton of Zug

Legal basis: Planning and Building Act (PBG) and Ordinance to the PBG (V PBG). Go to the cantonal information page.

Submission: digitally via cymo ebau to the municipality where the site is located; many municipalities additionally require paper copies with a signed submission receipt.

Plan author: no formal professional qualification required.

Minor projects and solar installations that do not significantly affect neighbours' or public interests are notified with a building notice (Bauanzeige, § 44a PBG). Everything else needs a building application (§ 44 PBG).

How your application works with us in the canton of Zug

  1. Enquiry. You send us the address, structure, dimensions and photos, via form, e-mail or WhatsApp. Takes 3 minutes.
  2. Preliminary check. Within 2 working days you know whether it is permit-free, a notification or a building application, with the procedure, documents and fee range.
  3. Approval. You confirm via the payment link and sign the power of attorney digitally.
  4. Application file. We prepare forms, construction description, site plan, floor plan, section and enclosures, complete and compliant with the municipality's requirements.
  5. Submission. You sign, we submit (digitally or by post) and confirm receipt to you.
  6. Decision. We answer the municipality's queries. You receive the authority's decision and information on the next steps.

Questions about the building application in the canton of Zug

What is permit-free in the canton of Zug?

Permit-free projects include very small structures such as greenhouses and garden sheds up to 4 m² floor area and terrain changes up to 1.2 m high and 50 m³ (§ 45 V PBG). According to the cantonal government, an uncovered pergola requires neither a building application nor a building notification (RRB BD 2023-114).

How do I submit a building application in the canton of Zug?

Digitally via cymo ebau at the municipality where the site is located; many municipalities also require paper copies with a signed submission receipt. Minor construction projects and solar installations that do not significantly affect neighbours' or public interests are reported with a construction notice (§ 44a PBG). Everything else requires a building application (§ 44 PBG).

Who may draw up building plans in the canton of Zug?

No formal professional qualification required.

Building application costs and scope of services · Prepare it yourself or have it done? · Dossier lead time and authorities' procedure

Towns and municipalities

Submitting a building application: local guides in the canton of Zug

Digital submission, paper enclosures and signatures differ from place to place. These local pages contain notes with an official source.

Local pages in the canton of Zug

Every municipality has its own building and zoning regulations. We check them for your location, even if your village has no local page here.

Enter another location and start a request

Building application in the canton of Zug, from CHF 690, in 5 working days.

Assessment in 2 working days. Non-binding.

Start enquiry
Start enquiryCheck