Solar installation (special case) in the canton of Thurgau: building permit needed?
Depends on size and location
Short answer: roof/façade installations: notification. Protected objects, open land, solar carport: building application.
Basis: Art. 18a RPG. Planning and Building Act (PBG). As of October 2026. Applies within the building zone and outside core zones and protected areas. Municipalities can be stricter.
New: solar check. Enter an address and see how suitable your roof is for solar power, using federal data. Go to the solar check
What specifically applies in the canton of Thurgau
Since 2026, normal roof and façade systems only need a notification. A building permit is still required for systems in core zones and protected areas, on protected buildings, free-standing systems, solar fences and solar carports. These are exactly the cases solar installers often leave aside; we take them on.
Permit-free in the canton of Thurgau: tool sheds up to 9 m² footprint and 2.2 m total height, terrain changes up to 0.7 m in height and 200 m² in area, and retaining walls within narrow limits are permit-free (§ 99 PBG).
Procedure: § 99 PBG exhaustively lists the permit-free structures. For minor projects, there is the simplified procedure.
Submission: cantonal building application form to the municipality; digitally via eBau Thurgau if the municipality offers it.
Note the official municipal instructions in the canton of Thurgau and our document checklist.
Our fixed price for a solar installation in the canton of Thurgau
- Preliminary check CHF 149, written assessment with the procedure, documents and fee range of your municipality. Credited towards the application.
- Building application CHF 1'290, complete dossier, submission, queries and deadlines until the decision. Excl. municipal fees.
- Retrospective building application CHF 990, if a solar installation is already in place and the municipality requires an application.
Frequently asked questions
Does a solar installation (special case) need a permit in the canton of Thurgau?
Depends on size and location. Roof and façade installations: notification. Protected properties, open land, solar carport: building application. Basis: Art. 18a RPG.
Which procedure applies in the canton of Thurgau?
§ 99 PBG lists permit-free structures exhaustively. For minor projects there is the simplified procedure.
Who may submit the application in the canton of Thurgau?
No formal professional qualification is required. You give us a power of attorney; the client and the landowner sign the application.
How much does the building application for a solar installation in the canton of Thurgau cost?
Our fixed price is CHF 1'290 for the dossier, including submission and follow-up questions. Authority fees and agreed additional services are extra; the official tariff depends on the location.
Municipalities in the canton of Thurgau
Solar system (special case) in other cantons
Solar installation (special case) in the canton of Thurgau: we submit the application.