Building permit in Aadorffor pergolas, louvred roofs, carports, garden sheds and pools

Small structures in Aadorf are governed by the building law of the canton of Thurgau plus the municipality's building and zoning regulations. We prepare the complete application, submit it to the competent building authority and support you through to the decision: fixed price from CHF 690.

A digital service by SL Handel GmbH, based in Zug, for your project in Aadorf.

Basic cantonal rule (Thurgau): Tool sheds up to 9 m² floor area and 2.2 m total height, terrain changes up to 0.7 m in height and 200 m² in area, and retaining walls within narrow limits are permit-free (§ 99 PBG).

Do I need a building permit?

Free initial assessment in 20 seconds: 9 cantons, 8 structures, as of October 2026.

What needs a permit in Aadorf

StructureClassification (canton of Thurgau)Rule
Pergola Building permit required Pergolas are not on the exhaustive list in § 99 PBG; they require a permit, usually under the simplified procedure.
Louvred roof Building permit required Covered patios require a building permit.
Patio cover Building permit required Patio covers require a building permit.
Carport Building permit required Carports require a building permit.
Garden shed Depends on size and location Tool sheds up to 9 m² and 2.2 m total height are permit-free; above that, a building application.
Pool Building permit required Permanently installed pools require a building permit.
Heat pump (outdoor unit) Depends on size and location Outdoor units: notification with a noise certificate, or a building application.
Solar installation (special case) Depends on size and location Roof or façade installations: notification. Protected properties, open land, solar carport: building application.

This table shows the cantonal rules. The municipality of Aadorf may set additional requirements in core zones, protected townscape areas and through its building regulations. We check the zoning plan and regulations for your plot. Cantonal information source.

Aadorf at a glance

Competent office
Aadorf Office for Building and Environment (Amt für Bau und Umwelt)
Submission
Cantonal building application form at the municipality; online via eBau Thurgau where the municipality offers it.
Building and zoning regulations
Available from the municipality; we obtain it for you.
Municipal fees
According to the municipal fee schedule, paid directly to the municipality.
Cadastral plan
From the geoportal of the canton of Thurgau; we obtain the extract.
Plan author
No formal professional qualification required.

Official sources checked on 24 October 2026. The municipality's information is authoritative.

How much does a building application cost in Aadorf?

Preliminary check: is a permit needed?CHF 149credited
Complete application for a pergola, louvred roof, carport, garden shed, pool or heat pumpCHF 690fixed price
Solar special case (core zone or protected building)CHF 1'290fixed price
Fee of the municipality of Aadorfas per tariffyou pay the municipality

Example: a 20 m² louvred roof on your house in Aadorf. You pay us CHF 690 for the application file, submission and queries. The municipality invoices its permit fee separately. We tell you the expected amount in the preliminary check.

Request a fixed price for Aadorf

Documents for your building application in Aadorf

You provide little, we handle the rest. Here is how it is split:

To the building application checklist with official submission examples

What you send us

  • Address of the property in Aadorf
  • 3 to 5 photos of the site (façade, patio, towards the boundary)
  • Dimensions or the manufacturer's drawing of the product
  • Signature of the building owner and the landowners
  • For condominium ownership: consent of the owners' association

What we obtain and prepare

  • Cadastral plan from the official survey
  • Site plan with the structure, dimensions and boundary distances
  • Application form for the canton of Thurgau, fully completed
  • Construction description, elevations and list of enclosures
  • Check of the Aadorf zoning plan and regulations
  • Depending on the structure: noise certificate (heat pump), neighbours' consent

Frequently asked questions about building applications in Aadorf

Where do I submit a building application in Aadorf?

At the building authority of the municipality of Aadorf. Cantonal building application form at the municipality; digitally via eBau Thurgau if the municipality offers it.

Do I need a permit for a louvred roof in Aadorf?

Covered seating areas require a building permit. Legal basis: § 98 PBG.

Is a garden shed permit-free in Aadorf?

Tool sheds up to 9 m² and 2.2 m total height are permit-free; above that, a building application is needed. Legal basis: § 99 PBG.

How much does a building application cost in Aadorf?

With us, the complete application costs a fixed price of CHF 690, including submission and queries; the preliminary check (CHF 149) is credited. The authority's fee comes on top and is based on the fee schedule of the municipality of Aadorf. We state the expected amount in the preliminary check.

Who may draw up the building application plans in Aadorf?

No formal professional qualification required.

How long does a building application take in Aadorf?

We prepare the application file within 5 working days of receiving all required documents. The authority's processing time depends on the procedure, completeness and any objections.

Already built in Aadorf?

If the municipality of Aadorf requires a retrospective building application, the deadline is running. We confirm it on the same working day, check whether the project can be approved and submit within 3 working days. Retrospective building application

Documents, signatures, power of attorney

How to sign a building application in Aadorf

Who signs, whether a scan is sufficient and what simplifications apply. We apply this information automatically in your dossier.

Submission
eBau Thurgau
Who signs
The applicant, the project author and the landowner, on the signature sheet that clearly identifies the application (eBau ID, plot).
Form of signature
A scan or photo is sufficient
Qualified electronic signature or a hand-signed, uploaded signature sheet. The municipality may ask for the original.
Small projects
Heat pumps: noise protection certificate according to Cercle Bruit.
Power of attorney
We submit as your authorised representative. We enclose the power of attorney with the application, so we need it with your handwritten signature.
Tenancy, condominium ownership
Tenants need the landlord's written consent (Art. 260a CO); as landowner, the landlord also signs the application. With condominium ownership, structural changes to common parts (façade, roof, patio with exclusive right of use) generally require the consent of all condominium owners or a resolution of the owners' meeting (Art. 647d, 647e and 712g CC). The condominium regulations are decisive.
Neighbours
Neighbours' consent is usually voluntary but often speeds up the procedure. If boundary or building distances are not respected, it is required, depending on the canton as an easement entered in the land register.

As of October 2026. Practice differs between municipalities; the municipality and canton are authoritative. Sources: Canton of Thurgau: eBau, frequently asked questions.

Building application in Aadorf, from CHF 690.

Assessment in 2 working days. Non-binding.

Start enquiry
Start enquiryCheck