Building permit in Wohlen bei Bernfor pergolas, louvred roofs, carports, garden sheds and pools
Small structures in Wohlen bei Bern are subject to the building law of the canton of Bern plus the municipality's building and zoning regulations. We prepare the complete application, submit it to the responsible building authority and support you until the decision: fixed price from CHF 690.
Digital service by SL Handel GmbH, based in Zug, for your project in Wohlen bei Bern.
What needs a permit in Wohlen bei Bern
| Structure | Classification (canton of Bern) | Rule |
|---|---|---|
| Pergola | Depends on size and location | Permit-free as an unheated small structure up to 10 m² and 2.5 m high, if functionally part of the main building. Larger or with a roof: building application (small procedure possible). |
| Louvred roof | Building permit required | Covered patios over 10 m² require a building permit; a small permit procedure without publication is often possible. |
| Patio cover | Building permit required | Patio roofs over 10 m² require a building permit. |
| Carport | Building permit required | Carports over 10 m² require a permit (practically every carport). |
| Garden shed | Depends on size and location | Unheated garden sheds up to 10 m² and 2.5 m need no permit; above that, a building application is required. Fully enclosed “garden halls” count as habitable and always require a permit. |
| Pool | Building permit required | Permanently installed pools require a permit. |
| Heat pump (outdoor unit) | Depends on size and location | Air-to-water heat pumps are permit-free if cantonal guidelines (noise, distances) are met; otherwise a building application is required. |
| Solar installation (special case) | Depends on size and location | Adapted roof or facade systems and small free-standing systems up to 10 m²: notification or exempt. Protected areas, larger open spaces, solar carport: building application via eBau. |
This table shows the cantonal rules. The municipality of Wohlen bei Bern can set additional requirements in core zones, in areas protecting the local townscape and through its building regulations. We check the zoning plan and regulations for your plot. Cantonal information source.
Wohlen bei Bern at a glance
- Competent office
- Construction and planning Wohlen bei Bern (Bau und Planung)
- Submission
- Building applications are entered on the eBau portal and also submitted to the municipality in two copies bearing original signatures.
- Building and zoning regulations
- Regulations and zoning plan of Wohlen bei Bern
- Municipal fees
- Under the fee regulations of Wohlen bei Bern, paid directly to the municipality.
- Cadastral plan
- From the geoportal of the canton of Bern; we obtain the extract.
- Plan author
- No formal professional qualification required; plan requirements under Art. 15 ff. BewD.
Note: according to the page, the building regulations are being revised. Zoning plans for the centre, east and west are available as PDFs on the building page.
Official sources checked on 24 October 2026. The municipality's information is authoritative.
How much does a building application cost in Wohlen bei Bern?
| Preliminary check: is a permit needed? | CHF 149credited |
| Complete application for a pergola, louvred roof, carport, garden shed, pool or heat pump | CHF 690fixed price |
| Solar special case (core zone or protected building) | CHF 1'290fixed price |
| Fee of the municipality of Wohlen bei Bern | as per tariffyou pay the municipality |
Example: louvred roof of 20 m² on your house in Wohlen bei Bern. You pay us CHF 690 for the dossier, submission and follow-up questions. The municipality invoices its permit fee separately. We tell you the expected amount in the preliminary check.
Request a fixed price for Wohlen bei BernDocuments for your building application in Wohlen bei Bern
You provide little, we handle the rest. Here is how it is split:
To the building application checklist with official submission examples
What you send us
- Address of the property in Wohlen bei Bern
- 3 to 5 photos of the site (façade, patio, towards the boundary)
- Dimensions or the manufacturer's drawing of the product
- Signature of the building owner and the landowners
- For condominium ownership: consent of the owners' association
What we obtain and prepare
- Cadastral plan from the official survey
- Site plan with the structure, dimensions and boundary distances
- Application form of the canton of Bern, fully completed
- Construction description, elevations and list of enclosures
- Check of the zoning plan and regulations of Wohlen bei Bern
- Depending on the structure: noise certificate (heat pump), neighbours' consent
Frequently asked questions about building applications in Wohlen bei Bern
Where do I submit a building application in Wohlen bei Bern?
Building applications are entered on the eBau portal and also submitted to the municipality in two copies bearing original signatures. The responsible office is "Bau und Planung" (construction and planning) of the municipality of Wohlen bei Bern.
Do I need a permit for a louvred roof in Wohlen bei Bern?
Covered patios over 10 m² require a building permit; a small permit procedure without publication is often possible. Legal basis: Art. 1a BauG, Art. 6 BewD.
Is a garden shed exempt from a permit in Wohlen bei Bern?
Unheated garden sheds up to 10 m² and 2.5 m high are permit-free; above that, a building application is required. Fully enclosed “garden halls” count as habitable and always require a permit. Legal basis: Art. 6 para. 1 let. a BewD.
How much does a building application cost in Wohlen bei Bern?
With us, the complete application costs a fixed price of CHF 690, including submission and follow-up questions; the preliminary check (CHF 149) is credited. The authority's fee is added and is based on the fee regulations of the municipality of Wohlen bei Bern. We tell you the expected amount in the preliminary check.
Who may draw up the plans for a building application in Wohlen bei Bern?
No formal professional qualification required; plan requirements under Art. 15 ff. BewD.
How long does a building application take in Wohlen bei Bern?
We prepare the application file within 5 working days of receiving all required documents. The authority's processing time depends on the procedure, completeness and any objections.
Already built in Wohlen bei Bern?
If the municipality of Wohlen bei Bern requires a retrospective building application, the deadline is decisive. We confirm it on the same working day, check whether the project can be approved and submit within 3 working days. Retrospective building application
How to sign a building application in Wohlen bei Bern
Who signs, whether a scan is sufficient and what simplifications apply. We apply this information automatically in your dossier.
- Submission
- eBau Bern (BE-Login)
- Who signs
- The building owner and the project author, or the authorised person if represented; for buildings on someone else's land, the landowner. Condominium ownership: all owners, or a power of attorney or the minutes of the owners' meeting together with the by-laws.
- Form of signature
- Paper original required
Submission via eBau has been mandatory since 1 March 2022. Many municipalities also require two copies signed in original; the application is only deemed submitted once they are received. - Small projects
- Minor building permit (Art. 27 BewD) with the written consent of all adjoining owners. Solar installations: notification via eBau with site plan and dimensioned roof plan at 1:100.
- Power of attorney
- We submit as your authorised representative. We enclose the power of attorney with the application, so we need it with your handwritten signature.
- Tenancy, condominium ownership
- Tenants need the landlord's written consent (Art. 260a CO); as landowner, the landlord also signs the application. With condominium ownership, structural changes to common parts (façade, roof, patio with exclusive right of use) generally require the consent of all condominium owners or a resolution of the owners' meeting (Art. 647d, 647e and 712g CC). The condominium regulations are decisive.
- Neighbours
- Neighbours' consent is usually voluntary but often speeds up the procedure. If boundary or building distances are not respected, it is required, depending on the canton as an easement entered in the land register.
As of October 2026. Practice differs between municipalities; the municipality and canton are authoritative. Sources: City of Bern: submitting a building application, Municipality of Wohlen: information sheet.
More municipalities in the canton of Bern
Your town isn't listed? We serve all municipalities in the canton of Bern. Start an enquiry for your town.
Building application in Wohlen bei Bern, from CHF 690.
Assessment in 2 working days. Non-binding.