BinningenMunicipality in the Canton of Basel-Landschaft

Building permit in Binningenfor pergolas, louvred roofs, carports, garden sheds and pools

For small structures in Binningen, the building law of the canton of Basel-Landschaft applies, plus the municipality's building and zoning regulations. We prepare the complete application, submit it to the responsible building authority and support you until the decision: fixed price from CHF 690.

Digital service by SL Handel GmbH, based in Zug, for your project in Binningen.

Basic cantonal rule (Basel-Landschaft): Traditional pergolas used as trellises, bicycle shelters up to 6 m² and uncovered parking spaces at single and multi-family houses are permit-free (§ 94 RBV). As soon as a pergola protects against the weather, whether fixed or movable, it counts as a covered patio.

Do I need a building permit?

Free initial assessment in 20 seconds: 9 cantons, 8 structures, as of October 2026.

What needs a permit in Binningen

StructureClassification (canton of Basel-Landschaft)Rule
Pergola Usually no permit required A traditional pergola as a climbing frame needs no permit and may even stand between the building line and the road. With weather protection, it becomes a covered seating area.
Louvred roof Building permit required If the area can be protected from the weather by fixed or movable installations, it counts as a covered patio: subject to distance rules and a permit, ordinary application to the building inspectorate.
Patio cover Building permit required Patio covers count as built-up area and need an ordinary building application at the Building Inspectorate (Bauinspektorat) in Liestal.
Carport Building permit required An open carport or one attached on one side requires a building permit.
Garden shed Depends on size and location Detached small structures up to 12 m² and 2.5 m: small-structure application to the municipality (simple procedure). Larger: ordinary application. Bike shelters up to 6 m² are exempt.
Pool Building permit required Permanently installed pools require a building permit.
Heat pump (outdoor unit) Depends on size and location Outdoor units: notification if noise protection is met, otherwise building application.
Solar installation (special case) Depends on size and location Roof and facade installations: notification. Protected zones, ground-mounted installations, solar carport: building application.

This table shows the cantonal rules. The municipality of Binningen may set additional requirements in core zones, protected townscape areas and through its building regulations. We check the zoning plan and regulations for your plot. Cantonal information source.

Binningen at a glance

Competent office
Binningen Building and Local Planning department; ordinary applications are reviewed by the cantonal building inspectorate in Liestal, small-structure applications (§ 92 RBV) by the municipality
Submission
Applications for small structures are submitted to the building and local planning department, Gemeinde Binningen Bauabteilungen, Hauptstrasse 36, 4102 Binningen; ordinary building applications to the building inspectorate in Liestal.
Building and zoning regulations
Regulations and zoning plan of Binningen
Municipal fees
According to the municipal fee schedule, paid directly to the municipality.
Cadastral plan
From the geoportal of the canton of Basel-Landschaft; we obtain the extract.
Plan author
No formal professional qualification required.

Official sources checked on 24 October 2026. The municipality's information is authoritative.

How much does a building application in Binningen cost?

Preliminary check: is a permit needed?CHF 149credited
Complete application for a pergola, louvred roof, carport, garden shed, pool or heat pumpCHF 690fixed price
Solar special case (core zone or protected building)CHF 1'290fixed price
Fee of the municipality of Binningenas per tariffyou pay the municipality

Example: a 20 m² louvred roof on your house in Binningen. You pay us CHF 690 for the dossier, submission and follow-up questions. The municipality invoices its permit fee separately. We tell you the expected amount in the preliminary check.

Request a fixed price for Binningen

Documents for your building application in Binningen

You provide little, we handle the rest. Here is how it is split:

To the building application checklist with official submission examples

What you send us

  • Address of the property in Binningen
  • 3 to 5 photos of the site (façade, patio, towards the boundary)
  • Dimensions or the manufacturer's drawing of the product
  • Signature of the building owner and the landowners
  • For condominium ownership: consent of the owners' association

What we obtain and prepare

  • Cadastral plan from the official survey
  • Site plan with the structure, dimensions and boundary distances
  • Application form for the canton of Basel-Landschaft, fully completed
  • Construction description, elevations and list of enclosures
  • Check of the zoning plan and regulations of Binningen
  • Depending on the structure: noise certificate (heat pump), neighbours' consent

Frequently asked questions about building applications in Binningen

Where do I submit a building application in Binningen?

Applications for small structures are submitted to the building and local planning department, Gemeinde Binningen Bauabteilungen, Hauptstrasse 36, 4102 Binningen; ordinary building applications to the building inspectorate in Liestal. The responsible office is the building and local planning department (“Abteilung Hochbau und Ortsplanung”) of the municipality of Binningen.

Do I need a permit for a louvred roof in Binningen?

If the area can be protected from the weather by fixed or movable installations, it counts as a covered seating area: subject to boundary distances and a permit, with an ordinary building application at the building inspectorate. Legal basis: § 94 RBV, practice since 1 January 2022.

Is a garden shed permit-free in Binningen?

Free-standing small structures up to 12 m² and 2.5 m: minor building application at the municipality (simple procedure). Larger: ordinary application. Bicycle shelters up to 6 m² are exempt. Legal basis: § 92, § 94 RBV.

How much does a building application in Binningen cost?

With us, CHF 690 fixed price for the complete application including submission and follow-up questions; the preliminary check (CHF 149) is credited. The authority's fee is added and follows the fee schedule of the municipality of Binningen. We tell you the expected amount in the preliminary check.

Who may draw up the plans for a building application in Binningen?

No formal professional qualification required.

How long does a building application in Binningen take?

We prepare the application file within 5 working days of receiving all required documents. The authority's processing time depends on the procedure, completeness and any objections.

Already built in Binningen?

If the municipality of Binningen requires a retrospective building application, the deadline is running. We confirm it on the same working day, check whether the project can be approved and submit within 3 working days. Retrospective building application

Documents, signatures, power of attorney

How to sign a building application in Binningen

Who signs, whether a scan is sufficient and what simplifications apply. We apply this information automatically in your dossier.

Submission
Electronic building application (Bauinspektorat)
Who signs
The applicant, the project author and the landowner, or an authorised person. If represented, the power of attorney must be enclosed.
Form of signature
Paper original required
Two sets of plans and the release receipt with original signatures go by post to the Bauinspektorat. Reinach has its own Bauinspektorat.
Small projects
Applications for small structures (§ 92 RBV) are examined by the municipality. Heat pumps: noise protection certificate according to Cercle Bruit.
Power of attorney
We submit as your authorised representative. We enclose the power of attorney with the application, so we need it with your handwritten signature.
Tenancy, condominium ownership
Tenants need the landlord's written consent (Art. 260a CO); as landowner, the landlord also signs the application. With condominium ownership, structural changes to common parts (façade, roof, patio with exclusive right of use) generally require the consent of all condominium owners or a resolution of the owners' meeting (Art. 647d, 647e and 712g CC). The condominium regulations are decisive.
Neighbours
Neighbours' consent is usually voluntary but often speeds up the procedure. If boundary or building distances are not respected, it is required, depending on the canton as an easement entered in the land register.

As of October 2026. Practice differs between municipalities; the municipality and canton are authoritative. Sources: Canton of Basel-Landschaft: questions and answers.

More municipalities in the canton of Basel-Landschaft

Your town isn't listed? We serve all municipalities in the canton of Basel-Landschaft. Start an enquiry for your town.

Building application in Binningen, from CHF 690.

Assessment in 2 working days. Non-binding.

Start enquiry
Start enquiryCheck