SpiezMunicipality in the Canton of Bern

Building permit in Spiezfor pergolas, louvred roofs, carports, garden sheds and pools

Small structures in Spiez are subject to the building law of the canton of Bern plus the municipality's building and zoning regulations. We prepare the complete application, submit it to the competent building authority and support you through to the decision: fixed price from CHF 690.

Digital service by SL Handel GmbH, based in Zug, for your project in Spiez.

Basic cantonal rule (Bern): Unheated small structures up to 10 m² floor area and 2.5 m high that are neither lived in nor used commercially and functionally belong to a main building are permit-free (Art. 6 para. 1 let. a BewD).

Do I need a building permit?

Free initial assessment in 20 seconds: 9 cantons, 8 structures, as of October 2026.

What needs a permit in Spiez

StructureClassification (canton of Bern)Rule
Pergola Depends on size and location Permit-free as an unheated small structure up to 10 m² and 2.5 m high, if functionally part of the main building. Larger or with a roof: building application (small procedure possible).
Louvred roof Building permit required Covered patios over 10 m² require a building permit; a small permit procedure without publication is often possible.
Patio cover Building permit required Patio roofs over 10 m² require a building permit.
Carport Building permit required Carports over 10 m² require a permit (practically every carport).
Garden shed Depends on size and location Unheated garden sheds up to 10 m² and 2.5 m need no permit; above that, a building application is required. Fully enclosed “garden halls” count as habitable and always require a permit.
Pool Building permit required Permanently installed pools require a permit.
Heat pump (outdoor unit) Depends on size and location Air-to-water heat pumps are permit-free if cantonal guidelines (noise, distances) are met; otherwise a building application is required.
Solar installation (special case) Depends on size and location Adapted roof or facade systems and small free-standing systems up to 10 m²: notification or exempt. Protected areas, larger open spaces, solar carport: building application via eBau.

This table shows the cantonal rules. The municipality of Spiez can set additional requirements in core zones, in areas protecting the local townscape and through its building regulations. We check the zoning plan and regulations for your plot. Cantonal information source.

Spiez at a glance

Competent office
Spiez building department (Abteilung Bau)
Submission
Building applications must be submitted electronically via eBau and also handed in to the municipality in two paper copies with the required signatures.
Building and zoning regulations
Regulations and zoning plan of Spiez
Municipal fees
According to the municipal fee schedule, paid directly to the municipality.
Cadastral plan
From the geoportal of the canton of Bern; we obtain the extract.
Plan author
No formal professional qualification required; plan requirements under Art. 15 ff. BewD.

Official sources checked on 24 October 2026. The municipality's information is authoritative.

How much does a building application in Spiez cost?

Preliminary check: is a permit needed?CHF 149credited
Complete application for a pergola, louvred roof, carport, garden shed, pool or heat pumpCHF 690fixed price
Solar special case (core zone or protected building)CHF 1'290fixed price
Fee charged by the municipality of Spiezas per tariffyou pay the municipality

Example: a 20 m² louvred roof on your house in Spiez. You pay us CHF 690 for the dossier, submission and follow-up queries. The municipality invoices its permit fee separately. We tell you the expected amount in the preliminary check.

Request a fixed price for Spiez

Documents for your building application in Spiez

You provide little, we handle the rest. Here is how it is split:

To the building application checklist with official submission examples

What you send us

  • Address of the property in Spiez
  • 3 to 5 photos of the site (façade, patio, towards the boundary)
  • Dimensions or the manufacturer's drawing of the product
  • Signature of the building owner and the landowners
  • For condominium ownership: consent of the owners' association

What we obtain and prepare

  • Cadastral plan from the official survey
  • Site plan with the structure, dimensions and boundary distances
  • Application form of the canton of Bern, fully completed
  • Construction description, elevations and list of enclosures
  • Check of the zoning plan and regulations of Spiez
  • Depending on the structure: noise certificate (heat pump), neighbours' consent

Frequently asked questions about building applications in Spiez

Where do I submit a building application in Spiez?

Building applications must be submitted electronically via eBau and also handed in to the municipality in two paper copies with the required signatures. The competent office is the building department (“Abteilung Bau”) of the municipality of Spiez.

Do I need a permit for a louvred roof in Spiez?

Covered patios over 10 m² require a building permit; a small permit procedure without publication is often possible. Legal basis: Art. 1a BauG, Art. 6 BewD.

Is a garden shed in Spiez permit-free?

Unheated garden sheds up to 10 m² and 2.5 m high are permit-free; above that, a building application is required. Fully enclosed “garden halls” count as habitable and always require a permit. Legal basis: Art. 6 para. 1 let. a BewD.

How much does a building application in Spiez cost?

With us, a fixed price of CHF 690 for the complete application including submission and follow-up queries; the preliminary check (CHF 149) is credited. The authority's fees are added and are based on the fee schedule of the municipality of Spiez. We tell you the expected amount in the preliminary check.

Who may draw up the building application plans in Spiez?

No formal professional qualification required; plan requirements under Art. 15 ff. BewD.

How long does a building application in Spiez take?

We prepare the application file within 5 working days of receiving all required documents. The authority's processing time depends on the procedure, completeness and any objections.

Already built in Spiez?

If the municipality of Spiez requires a retrospective building application, the deadline is decisive. We confirm it on the same working day, check whether the project can be approved and submit within 3 working days. Retrospective building application

Documents, signatures, power of attorney

How to sign a building application in Spiez

Who signs, whether a scan is sufficient and what simplifications apply. We apply this information automatically in your dossier.

Submission
eBau Bern (BE-Login)
Who signs
The building owner and the project author, or the authorised person if represented; for buildings on someone else's land, the landowner. Condominium ownership: all owners, or a power of attorney or the minutes of the owners' meeting together with the by-laws.
Form of signature
Paper original required
Submission via eBau has been mandatory since 1 March 2022. Many municipalities also require two copies signed in original; the application is only deemed submitted once they are received.
Small projects
Minor building permit (Art. 27 BewD) with the written consent of all adjoining owners. Solar installations: notification via eBau with site plan and dimensioned roof plan at 1:100.
Power of attorney
We submit as your authorised representative. We enclose the power of attorney with the application, so we need it with your handwritten signature.
Tenancy, condominium ownership
Tenants need the landlord's written consent (Art. 260a CO); as landowner, the landlord also signs the application. With condominium ownership, structural changes to common parts (façade, roof, patio with exclusive right of use) generally require the consent of all condominium owners or a resolution of the owners' meeting (Art. 647d, 647e and 712g CC). The condominium regulations are decisive.
Neighbours
Neighbours' consent is usually voluntary but often speeds up the procedure. If boundary or building distances are not respected, it is required, depending on the canton as an easement entered in the land register.

As of October 2026. Practice differs between municipalities; the municipality and canton are authoritative. Sources: City of Bern: submitting a building application, Municipality of Wohlen: information sheet.

More municipalities in the canton of Bern

Your town isn't listed? We serve all municipalities in the canton of Bern. Start an enquiry for your town.

Building application in Spiez, from CHF 690.

Assessment in 2 working days. Non-binding.

Start enquiry
Start enquiryCheck