Bad RagazMunicipality in the Canton of St. Gallen

Building permit in Bad Ragazfor pergolas, louvred roofs, carports, garden sheds and pools

For small structures in Bad Ragaz, the building law of the canton of St. Gallen applies, plus the municipality's building and zoning regulations. We prepare the complete application, submit it to the responsible building authority and support you until the decision: fixed price from CHF 690.

Digital service by SL Handel GmbH, based in Zug, for your project in Bad Ragaz.

Basic cantonal rule (St. Gallen): Only the minor projects listed in Art. 136 para. 2 PBG are permit-free. Shade sails, pergolas with a roof and carports require a permit.

Do I need a building permit?

Free initial assessment in 20 seconds: 9 cantons, 8 structures, as of October 2026.

What needs a permit in Bad Ragaz

StructureClassification (canton of St. Gallen)Rule
Pergola Building permit required The administrative court classified a roofed pergola as a building; open pergolas are assessed case by case: a preliminary assessment is recommended.
Louvred roof Building permit required Covered patios require a building permit.
Patio cover Building permit required Patio covers and large shade sails require a building permit.
Carport Building permit required Carports require a building permit.
Garden shed Depends on size and location Small garden sheds may fall under Art. 136 para. 2 PBG; larger ones need a building application to the municipality.
Pool Building permit required Permanently installed pools require a building permit.
Heat pump (outdoor unit) Depends on size and location Outdoor units: notification with a noise certificate, or a building application.
Solar installation (special case) Depends on size and location Solar installations under the RPG: notification (cantonal notification form 2026). Protected properties, open land, solar carport: building application.

This table shows the cantonal rules. The municipality of Bad Ragaz may set additional requirements in core zones, protected townscape areas and through its building regulations. We check the zoning plan and regulations for your plot. Cantonal information source.

Bad Ragaz at a glance

Competent office
Building and environment Bad Ragaz (Bau und Umwelt)
Submission
Cantonal building application form (G1) on paper at the municipality; a cantonal eBau is planned from 2027.
Building and zoning regulations
Regulations and zoning plan of Bad Ragaz
Municipal fees
According to the municipal fee schedule, paid directly to the municipality.
Cadastral plan
From the geoportal of the canton of St. Gallen; we obtain the extract.
Plan author
No formal professional qualification required.

Official sources checked on 24 October 2026. The municipality's information is authoritative.

How much does a building application in Bad Ragaz cost?

Preliminary check: is a permit needed?CHF 149credited
Complete application for a pergola, louvred roof, carport, garden shed, pool or heat pumpCHF 690fixed price
Solar special case (core zone or protected building)CHF 1'290fixed price
Fee of the municipality of Bad Ragazas per tariffyou pay the municipality

Example: a 20 m² louvred roof on your house in Bad Ragaz. You pay us CHF 690 for the dossier, submission and follow-up questions. The municipality invoices its permit fee separately. We tell you the expected amount in the preliminary check.

Request a fixed price for Bad Ragaz

Documents for your building application in Bad Ragaz

You provide little, we handle the rest. Here is how it is split:

To the building application checklist with official submission examples

What you send us

  • Address of the property in Bad Ragaz
  • 3 to 5 photos of the site (façade, patio, towards the boundary)
  • Dimensions or the manufacturer's drawing of the product
  • Signature of the building owner and the landowners
  • For condominium ownership: consent of the owners' association

What we obtain and prepare

  • Cadastral plan from the official survey
  • Site plan with the structure, dimensions and boundary distances
  • Application form for the canton of St. Gallen, fully completed
  • Construction description, elevations and list of enclosures
  • Check of the zoning plan and regulations of Bad Ragaz
  • Depending on the structure: noise certificate (heat pump), neighbours' consent

Frequently asked questions about building applications in Bad Ragaz

Where do I submit a building application in Bad Ragaz?

At the building authority of the municipality of Bad Ragaz. Cantonal building application form (G1) on paper at the municipality; a cantonal eBau is planned from 2027.

Do I need a permit for a louvred roof in Bad Ragaz?

Covered seating areas require a building permit. Legal basis: Art. 136 PBG.

Is a garden shed permit-free in Bad Ragaz?

Small garden sheds may fall under Art. 136 para. 2 PBG; larger ones need a building application at the municipality. Legal basis: Art. 136 Abs. 2 PBG.

How much does a building application in Bad Ragaz cost?

With us, CHF 690 fixed price for the complete application including submission and follow-up questions; the preliminary check (CHF 149) is credited. The authority's fee is added and follows the fee schedule of the municipality of Bad Ragaz. We tell you the expected amount in the preliminary check.

Who may draw up the plans for a building application in Bad Ragaz?

No formal professional qualification required.

How long does a building application in Bad Ragaz take?

We prepare the application file within 5 working days of receiving all required documents. The authority's processing time depends on the procedure, completeness and any objections.

Already built in Bad Ragaz?

If the municipality of Bad Ragaz requires a retrospective building application, the deadline is running. We confirm it on the same working day, check whether the project can be approved and submit within 3 working days. Retrospective building application

Documents, signatures, power of attorney

How to sign a building application in Bad Ragaz

Who signs, whether a scan is sufficient and what simplifications apply. We apply this information automatically in your dossier.

Submission
Formular G1 (electronic submission in preparation)
Who signs
The landowner, the applicant and the project author; the form has a separate field for the tenant or installation operator.
Form of signature
Paper original required
Submission on paper, usually in triplicate, with original signatures. Electronic procedural steps are planned from 2027.
Small projects
Simplified procedure (Art. 82bis PBG). Solar installations: notification form no later than 30 days before construction starts.
Power of attorney
We submit as your authorised representative. We enclose the power of attorney with the application, so we need it with your handwritten signature.
Tenancy, condominium ownership
Tenants need the landlord's written consent (Art. 260a CO); as landowner, the landlord also signs the application. With condominium ownership, structural changes to common parts (façade, roof, patio with exclusive right of use) generally require the consent of all condominium owners or a resolution of the owners' meeting (Art. 647d, 647e and 712g CC). The condominium regulations are decisive.
Neighbours
Neighbours' consent is usually voluntary but often speeds up the procedure. If boundary or building distances are not respected, it is required, depending on the canton as an easement entered in the land register.
Good to know
Plan colours: existing black, demolition yellow, new red.

As of October 2026. Practice differs between municipalities; the municipality and canton are authoritative. Sources: Canton of St. Gallen: notification of solar installations.

More municipalities in the canton of St. Gallen

Your town isn't listed? We serve all municipalities in the canton of St. Gallen. Start an enquiry for your town.

Building application in Bad Ragaz, from CHF 690.

Assessment in 2 working days. Non-binding.

Start enquiry
Start enquiryCheck